TM 5-4310-362-14
2-3. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (cont)
B - Before Operation
D - During Operation
A - After Operation
W - Weekly
ITEM TO BE INSPECTED
Equipment Will Be
ITEM
INTERVAL
Reported Not
NO.
PROCEDURE:
Ready (RED) If:
BDAW
5
OIL FILL GAGE. Check oil level with fill gage
(6). Add oil to bring level up to full mark.
6
OIL DRAIN PIPE AND CAP. Check for leaks
around pipe (7) and cap (8). Tighten to stop leak.
If leak can't be stopped by tightening, replac e.
2-4 Change 1