TM 5-4310-379-14
(p)
Install lockwasher (25) and screw (26) and bend down tab on lockwasher (25).
(q)
Install flyweight and carrier assembly (27), with the machined surfaces of fork (11) bearing against
the outer surface of thrust bearing (20).
(r)
Install plunger guide (28).
(s)
Position spring lever (29) in housing (30).
(t)
Install shaft (31) in housing (30) and spring lever (29).
(u)
Ensure set screw (32) on spring lever (29) alines with flat on shaft (31) and tighten set screw (32).
Torque set screw (32) to 12-15 Ib-ft (16-20 Nm).
(v)
Stake the edge of the spring lever set screw hole to retain the set screw (32) in the spring lever (29).
(w)
Install plug (33).
(x)
Install O-ring (34) and ensure it seats in bearing bore and up against bearing (4).
(y)
Install washer (35) and lever (36) and tighten screw (37).
(z)
Install cover (38) and gasket (39) and secure with screw (40) and lockwasher (41).
(aa)
Install spring retainer (42), shims (43), spring (44), plunger (45) in housing (30), and install gasket
(46) and housing (30) and secure with two screws (47) and lockwashers (48).
(ab)
Install shaft (49) in cover (3).
(ac)
Install 0-ring (50) on shaft (49) and ensure it seats in bearing bore and up against bearing (1).
(ad)
Install washers (51) and retainer (52).
(ae)
Install spring (53) and lever (54) and tighten screw (55).
(af)
Install rod (56) and secure with clip (57).
(ag)
Install cover (3) and ensure pin on shaft (49) alines with slot in arm (16) and install gasket (57), and
bracket (59) and secure with four screws (60), three lockwashers (61), and one spacer (62).
(ah)
Loosen screw (55) and turn lever (54) one full turn counterclockwise to provide initial spring pressure
to lever (54) and tighten screw (55).
(ai)
Install plugs (63) and (64).
FOLLOW-ON MAINTENANCE
Install governor assembly (para. 4-11).
Change1 5-35