TM 5-4310-382-13
3-32. ENGINE SPEED CONTROL.
This task covers:
a. Removal
b. Cleaning
c. Inspection
d. Installation
INITIAL SETUP
Tools Required
Tool Kit, General Mechanic's
Materials Required
Equipment Condition
Engine shut down and cool.
Pressurized air drained from unit.
a. Removal.
(1) Remove hose clamp (4) and tubing (5) from barbed fitting (3) and slow down device (2).
(2) Remove screw (7), lockwasher (6), and nut (8) from slow down device (2).
(3) Remove screw (10) from governor plate (9).
(4) Remove slow down device (2) from engine governor bracket (1) and disengage linkage from governor plate
(9).
3-74