TM-5-4310-389-14
Section VI.
UNIT MAINTENANCE PROCEDURES
3-16 COMPRESSOR.
DESCRIPTION
This task covers: Inspect, Test, Service, Adjust.
INITIAL SETUP
Tools:
Equipment conditions:
General Mechanic Tool Kit
1. Compressor unit secured
(paragraph 2-11).
2. Bleed off all air pressure
(paragraph 2-3, b).
Materials/parts:
Oil, item 22 Appendix E
Brush, item 8 Appendix E
Lint-free Cloth, item 9 Appendix E
Funnel, item 16 Appendix E
INSPECT
a.
General.
WARNING
Ensure that the compressor unit is secured and that system pressure has been bled to zero.
1.
Inspect the air intake filter; ensure it is free from obstruction.
2.
Ensure all hoses are securely in place.
3.
Inspect the fins on the after cooler for dust.
4.
If battery cables are frayed or oxidized, replace as required.
b.
Oil Level Check.
3-20