TM 5-4310-451-14
5-15. ENGINE AND AIR COMPRESSOR REPLACEMENT (Cont).
7.
Install two new locknuts (8) on screws (3) at front engine mounts (5).
8.
Install two new locknuts (10) on screws (15) at rear engine mounts (12).
FOLLOW-ON TASKS:
Install fan assembly (see paragraph 4-47).
Connect air compressor to oil separator (see paragraph 5-102).
Connect air compressor main oil filter lines (see paragraph 4-101).
Install pressure regulating valve (see paragraph 4-87).
Connect air compressor discharge temperature lead (see paragraph 4-79).
Connect discharge temperature switch to air compressor discharge housing (see paragraph 4-79).
Install governor linkage on governor and air compressor (see paragraph 4-40).
Connect tachometer drive to engine (see paragraph 4-77).
Connect ether line to blower inlet tube (see paragraph 5-14).
Connect emergency stop cable to engine governor (see paragraph 4-39).
Connect governor control assembly line (see paragraph 4-40).
Connect engine fuel stop control solenoid (see paragraph 5-66).
Connect cold stop valve leads (see paragraph 4-49).
Install engine temperature gage line (see paragraph 4-77).
Connect starter electrical lead (see paragraph 4-53).
Connect alternator electrical lead (see paragraph 4-51).
Install radiator hoses (see paragraphs 4-49 and 5-105).
Install fuel return line (see paragraph 4-37).
Install fuel tank-to-engine fuel line (see paragraph 4-34).
Install rear bottom cover (see paragraph 4-81).
Install center bottom cover (see paragraph 4-81).
Install lift bail (see paragraph 5-97).
Install radiator housing side braces (see paragraph 5-71).
Install center roof panel (see paragraph 5-85).
Fill radiator with coolant (see Lubrication Instructions, Chapter 3, Section 1).
Connect batteries (see paragraph 4-60).
5-21