TM 5-4310-452-14
5-5. ENGINE REPLACEMENT (Con't).
FOLLOW-ON TASKS:
· Install oil line (see paragraph 4-20).
· Install fuel injection pump and governor (see paragraph 5-20).
· Install metering fuel pump (see paragraph 4-22).
· Install solenoid valve (see paragraph 4-59).
· Install oil filter base assembly (see paragraph 4-19).
· Install unloader valve assembly (see paragraph 4-90).
· Install oil cooler (see paragraph 4-17).
· Install engine throttle control (see paragraph 4-25).
· Install cowling, duct, guide rail, shield, and plates (see paragraph 4-34).
· Install blower assembly fan (see paragraph 4-32).
· Connect engine stop cable at governor (see paragraph 4-29).
· Install idler pulley (see paragraph 4-35).
Install belt break switch (see paragraph 4-42).
Install oil temperature switch (see paragraph 4-43).
Install compressor fan and fan drive (see paragraph 4-92).
Install blowdown valve (see paragraph 4-95).
Install starter motor (see paragraph 4-39).
· Install alternator (see paragraph 4-36).
Install fuel lines and fittings (see paragraph 4-24).
Connect compressor oil lines and fittings (see paragraph 4-86).
Install intake manifold (see paragraph 4-15).
· Install exhaust manifold (see paragraph 4-14).
· Install storage batteries (see paragraph 4-57).
· Install roof assembly (see paragraph 5-31).
Install door assemblies (see paragraph 5-28).
Close left and right door assemblies.
5-12