TM 5-4310-451-14
5-59. FUEL INJECTOR CONTROL TUBE MAINTENANCE.
This Task Covers:
a.
Removal
d.
Assembly
b.
Disassembly
e.
Installation
c.
Cleaning and Inspection
Initial Setup:
Equipment Conditions:
Materials/Parts:
Rocker arm covers removed (see paragraph 4-29).
Dry cleaning solvent (Item 38, Appendix E)
Tools/Test Equipment:
Two cotter pins
General mechanic's tool kit
Two spring pins
Field automotive shop set
Six locknuts
General Safety Instructions:
Dry cleaning solvent Is flammable and must not be used near open flame. Use only in a well-ventilated area.
Compressed air used for cleaning purposes should never exceed 30 psi (207 kPa).
a. REMOVAL
NOTE
Right and left bank Injector control tubes are removed same way. This procedure
covers right bank Injector control tube.
1.
Remove cotter pin (2) and pin (1) from clevis (6). Discard cotter pin.
2. Remove four screws (5) and control tube (4) from cylinder head (7).
RIGHT BANK
TA705065
5-193