TM 5-4310-451-14
5-66. LOAD SOLENOID MAINTENANCE.
This Task Covers:
a.
Removal
d.
Assembly
b.
Disassembly
e.
Installation
c.
Cleaning and Inspection
Initial Setup:
Equipment Conditions:
Materials/Parts:
ì Master battery switch in OFF position.
ì Marker tags (Item 40, Appendix E)
ì Seven lockwashers
Tools/Test Equipment:
ì General mechanics tool kit
a. REMOVAL
1.
Remove two nuts (1). Tag and remove three wires (2) from load solenoid (3).
2.
Disconnect spring (5) from lever (8).
TA705114
5-244