• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 84. Adjusting cutout relay point opening.
Figure 86. Checking voltage regulator setting.

Compressor Air Truck-Mounted Gasoline-Driven 210 Cfm Le Roi Model 210G1 Page Navigation
  185    186    187    188    189  190  191    192    193    194    195  
img
. .
Figure 85. Adjusting cutout relay closing voltage.
required. Tighten the screws after adjustment. Measure the contact point opening with the contacts open
(fig. 84). The contact point opening should be 0.32 inch. Bend the upper armature stop with an offset
screwdriver to adjust the contact point opening as required. Connect the regulator (fig. 82) and check the
192


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.