minutes before assembling. New in-
1.691 inch for outside diameter of in-
serts should have .003 to .005 inch
sert (A), as shown in figure 70. Chill
press fit with counterbore.
insert in container of dry ice for 20
FRAME PARTS
Section VII.
135. Tool and Battery Boxes
a. Disassembly. Refer to figure 22 for disas-
a. Removal. Refer to figure 72 for removal
sembly of mounting frame.
of tool and battery boxes.
b. Cleaning and Inspection.
b. Cleaning and Inspection.
(1) Clean all metal parts with an approved
(1) Clean all parts with an approved
cleaning solvent and dry thoroughly.
cleaning solvent and dry thoroughly.
(2) Inspect all parts for cracks, bends,
(2) Inspect for cracks, bends, breaks, or
other damage. Repair or replace if
breaks, or other damage. Repair or
replace if necessary.
unserviceable.
c. Reassembly. Refer to figure 22 for reas-
(3) Check all lid stays for proper opera-
sembly of mounting frame.
tion. Replace if unserviceable.
c. Installation. Refer to figure 72 for instal-
lation of tool and battery boxes.
AGO 8166A