TM 5-4310-277-14
c. Installation. Install the air receiver tank as
b. Cleaning, Inspection and Repair.
(1) Clean items with dry compressed air and
illustrated in Figure 4-29, and reconnect all tubing
inspect for damage.
and plumbing to the tank.
(2) Replace a damaged air receiver.
Section XIV. MAINTENANCE OF ENGINE (MODEL BGR-5M-1)
(2) Remove fuel line connections to the engine
after first draining the fuel tank.
On Model BGR-5M-1 air compressor, the gasoline
(3) Disconnect slowdown tube connection to
pneumatic cylinder mounted to engine.
tached to a base assembly which is then mounted to
(4) Remove belt guard and V-belts.
a trailer.
(5) Remove gasoline engine as illustrated in
a. Removal.
from the compressor by opening the draincock.