TM 5-4310-368-14
a. Removal
(1) Disconnect pressure line.
(2) Remove attaching hardware.
(3) Remove gage from panel.
(4) Remove tube fitting.
b. Installation
(1) Apply teflon tape to pipe thread connection at back of gage.
(2) Install and secure tube fitting onto gage.
NOTE
Hold gage fitting with open end wrench during tightening.
(3) Install gage into instrument panel.
(4) Secure gage with proper hardware.
(5) Attach and secure pressure tube.
5-25.
MANUAL SWITCHES (Figure 5-31)
This task covers:
a. Testing
b. Replacement
INITIAL SETUP
Applicable Configurations
All
a. Testing
(1) Operate switch. Verify proper operation.
b. Replacement
(1) Disconnect wiring. Note location of wires for reconnection late.
(2) Loosen and remove mounting nut and washer.
5-48