TM 5-4310-373-14
4-33. FLYWHEEL/lNSPECTION/REMOVAL/lNSTALLATION
This task covers:
The inspection, removal and installation of the flywheel.
INITIAL SETUP
Equipment Condition:
Tools:
Main power OFF
Materials/Parts:
Lubricating Oil, Engine
OE-30, or equivalent
Approximate Time Required (minutes):
Personnel Required:
50
1 Mechanic
REMARKS
ACTION
LOCATION/lTEM
Disconnect.
1. Main power
Remove.
2. Belt guard cover
Remove
3. V-belts
Look for cracks, damaged blades, loose mounting bolt
Inspect.
4. Flywheel (3)
(1) and nut (2). Replace if defective.
Remove.
1.
Bolt (1), nut (2)
Tap wedge in slot of flywheel
2. Flywheel hub
hub
carefully to loosen
flywheel.
Remove.
3. Flywheel (3)
Remove.
4. Key (4)
Figure 4-58. Flywheel removal
4-45