TM 5-4310-373-14
This task covers:
Removal of the V-belts.
INITIAL SETUP
Equipment Condition:
Tools:
Main power OFF
Materials/Parts:
As required
Personnel Required:
Approximate Time Required (minutes):
1 Mechanic
10
REMARKS
ACTION
LOCATION/lTEM
1. Main power
Disconnect.
2. Belt guard cover
Remove.
3. Electric motor mounting
Loosen.
bolts (1)
4. Electric motor (2)
Slide motor in direction of
arrow to relieve belt tension.
5. 2 V-belts (3)
Remove.
Belt may be cut or damaged if removed under full tension.
Figure 4-43. Motor mounting, loosen
Figure 4-44. V-belt removal
4-36