TM 5-4310-373-14
4-51. HOSES, REMOVAL/lNSTALLATION
This task covers:
The removal and installation of hoses.
INITIAL SETUP
Tools:
Equipment Condition:
Shutoff valve closed or air in tank discharged
Materials/Parts:
As required
Personnel Required:
Approximate Time Required (minutes):
1 Mechanic
15
LOCATION/lTEM
ACTION
REMARKS
WARNING
Shutoff valve must be closed
or air in tank must be dis-
charged before removal of
hoses. Removal under pres-
sure could cause serious
injury.
1. Shutoff valve (1)
Close.
2. Inflator gage (2)
Depress lever to discharge re-
maining air in hoses.
3. Hoses (3)
Remove by disconnecting
1. Hoses (3)
a. Install by connecting
6.
b. Tighten.
2. Shutoff valve (1)
Open.
Figure 4-91. Air hose replace
4-86