TM 5-4310-451-14
5-35. PISTONS, CONNECTING RODS, AND CYLINDER SLEEVES REPLACEMENT
(Cont).
16.
Install sleeve bearing (6) and bearing cap (5) to
connecting rod (7) with two nuts (4). Torque
nuts to 65-75 Ib. ft. (88-102 N.m).
17.
Using feeler gage, measure clearance between
connecting rod (7) at each of three crankshaft
journals. Clearance should be 0.008-0.016 in.
(0.203-0.406 mm).
FOLLOW-ON TASKS:
Install cylinder head (see paragraph 5-28).
Install oil pan (see paragraph 4-32).
Install engine (see paragraph 5-15).
5-108