b. Cleaning and Inspection.
(1) Clean all metal parts with an ap-
proved cleaning solvent and dry thoroughly.
(2) Inspect for cracks, breaks, leaks, and
other damage.
(3) Replace a damaged or defective relay
valve.
c. Installation. Refer to figure 3-17 and in-
3-80 Air Reservoir
the air reservoir.
b. Cleaning and Inspection.
(1) Clean the reservoir with an approved
cleaning solvent and dry thoroughly.
(2) Inspect for cracks, breaks, leaks and
other damage.
(3) Replace a damaged or defective air
reservoir.
install the air reservoir.
the air filters.
b. Disassembly and Reassembly. The air
filter may be disassembled and reassembled as
c. Cleaning and Inspection.
(1) Clean the air filters with an approved
cleaning solvent and dry thoroughly.
(2) Inspect for cracks, breaks, leaks, and
other damage.
(3) Replace a damaged or defective air
filter.
install the air filter.
Section XV. FRAME ASSEMBLY
sorbers are two-way control, double-acting,
hydraulic-cylinder units. This section contains
This section consists of the landing gear,
information on the maintenance of these items.