TM 5-4310-373-14
4-24. BELT GUARD ASSEMBLY INSTALLATION
This task covers:
Installation of the belt guard assembly.
INITIAL SETUP
Equipment Condition:
Tools:
Main power OFF
Materials/Parts:
As required
Approximate Time Required (minutes):
Personnel Required:
30
1 Mechanic
REMARKS
ACTION
LOCATION/lTEM
Disconnect.
1.
Main power
Belt guard housing (1)
a. Attach to base with screws
2.
(2), nuts and Iockwashers.
b. Attach to manifold (3)
with existing manifold cap
screw.
Figure 4-41. Belt guard assembly installation
Install.
Drive pulley (4)
3.
Flywheel (5)
Install.
4.
Electric motor mounting
Loosen four.
5.
bolts
V-belts (7)
Install.
6.
Adjust.
7.
V-belts (7)
Attach with screws (9).
Belt guard cover (8)
8.
Figure 4-42. Belt guard cover
4-35