TM 5-4310-354-14
REMOVAL
STEP 1.
REMOVE WIRE STOP FROM END OF
IDLE CONTROL CABLE ACTUATING
WIRE.
LOOSEN CABLE CLAMP AND
REMOVE
CONTROL
CABLE
FROM
CLAMP.
STEP 2.
UNSCREW
IDLE
CONTROL
CABLE
MOUNTING NUT. WITHDRAW CONTROL
CABLE OUT THROUGH INSTRUMENT
PANEL, MOUNTING WASHER, AND NUT.
STEP 3.
UNLOADER
CONTROL
CABLE
ACTUATING WIRE. LOOSEN WIRE STOP
ON UNLOADER LEVER, LOOSEN CABLE
CLAMP, WITHDRAW CABLE FROM
CLAMP.
STEP 4.
UNSCREW UNLOADER CONTROL CABLE
MOUNTING NUT. WITHDRAW CONTROL
CABLE OUT THROUGH INSTRUMENT
PANEL, MOUNTING WASHER, AND NUT.
INSTALLATION
STEP 1.
CONTROL CABLE THROUGH HOLE IN
INSTRUMENT
PANEL,
THROUGH
MOUNTING
WASHER,
AND
NUT.
SECURE UNLOADER CONTROL CABLE
TO INSTRUMENT PANEL, WITH LOCKED
HANDLE IN VERTICAL POSITION, BY
TIGHTENING MOUNTING NUT.
STEP 2.
INSTALL UNLOADER CONTROL CABLE
THROUGH CABLE CLAMP WITH CABLE
ACTUATING WIRE THROUGH WIRE
STOP. SECURE CABLE BY TIGHTENING
CABLE CLAMP.
MOVE UNLOADER
SHAFT LEVER AGAINST STOP PIN TO
CLOSE INTAKE VALVE PLATE FULLY.
BEND CONTROL CABLE ACTUATING
WIRE APPROXIMATELY 1/2-INCH FROM
END.
UNLOCK UNLOADER CONTROL
HANDLE AND PULL OUT TO UNLOAD
POSITION.
TIGHTEN WIRE STOP ON
INTAKE LEVER TO SECURE ACTUATING
WIRE. PUSH IN UNLOADER CONTROL
TS5-4310-354-14/4-34 (6)
HANDLE AND LOCK. CHECK TO MAKE
CERTAIN THAT INTAKE VALVE PLATE IS
FULLY OPEN (VERTICAL).
J
CONTROL CABLES
STEP 3.
RUN IDLE CONTROL CABLE THROUGH
STEP 4.
RUN IDLE CONTROL CABLE THROUGH
HOLE
IN
INSTRUMENT
PANEL,
CABLE CLAMP, CABLE ACTUATING WIRE
THROUGH MOUNTING WASHER, AND
THROUGH STOP BLOCK, AND INSTALL
NUT. SECURE IDLE CONTROL CABLE
WIRE STOP ON END OF ACTUATING
TO INSTRUMENT PANEL, WITH LOCKED
WIRE. SECURE CONTROL CABLE BY
HANDLE IN VERTICAL POSITION, BY
TIGHTENING CABLE CLAMP. AT FULL
TIGHTENING MOUNTING NUT.
ENGINE SPEED THERE SHOULD BE
APPROXIMATELY 1/8-INCH CLEARANCE
BETWEEN WIRE STOP AND STOP
SPEED
CONTROL
LINKAGE
ADJUSTMENT.)
Figure 4-34. Instrument panel controls, instruments, and gauges, removal and installation (sheet 6 of 7).
4-75