TM 5-4310-378-14
Section II. Maintenance Procedures.
5-2. AIR COMPRESSOR OVERHAUL
This task covers:
a.
Overhaul
Tools:
1 3 - m m wrench
3 / 8 - i n c h wrench
1 9 - m m wrench
2 1 - m m wrench
G e a r Puller
P l i e r s , common
2 4 - m m wrench
P l i e r s , Snap-Ring
R e a r Bearing Cover Packing
Material:
F r o n t Bearing Cover Packing
Front Oil Seal
O i l Sight Gage Seal
H e a d Gasket (3 each)
F i r s t Stage Outlet Valve Packing (2 each)
S e c o n d Stage Outlet Valve Packing
C y l i n d e r Gasket. (3 each)
F i r s t Stage Compression Ring Set (2 each)
F i r s t Stage Oil Ring (2 each)
S e c o n d Stage Compression Ring Set
S e c o n d Stage Oil Ring
Equipment Condition:
C o m p r e s s o r removed from handtruck
a. O v e r h a u l .
(1) Remove four bolts (l), and eight
w a s h e r s (2).
( 2 ) Remove head (3) and gasket (4).
D i s c a r d gasket.