TM 5-4310-376-14
4-5. CHECKING UNPACKED EQUIPMENT
a. Inspect the equipment for damage incurred during shipment. If the equipment has been
damaged, report the damage on DD Form 6, Packaging Improvement Report.
b. Check the equipment against the packing slip to see if the shipment is complete. Report
all discrepancies in accordance with the instructions of TM 38-750.
c. Check to see whether the equipment has been modified. Modification Work Order (MWOs)
numbers will appear ONLY if the unit(s) has been used or reconditioned.
4-6. INSTALLATION INSTRUCTIONS
Organizational maintenance will install air compressor.
a. Tools and Equipment. Tools and equipment required for installation are available in the
Army supply system.
b. Assembly of Equipment. Remove components from box removed in paragraph 4-4.
Assemble as follows:
(1) Globe Valve (1)
(a) Install nipple (2) into air receiver tank (3).
(b) Install globe valve (1) into nipple (2) with handle facing up.
(c) Install reducer (4) and adapter (5) onto valve (1).
LEGEND
GLOBE VALVE
1.
NIPPLE
2.
AIR TANK
3.
REDUCER
4.
ADAPTER
5.
AIR HOSE
6.
INFLATOR GAGE
7.
(2) Air Hose (6) and Inflator Gage (7)
(a) Connect inflator gage (7) to air hose (6).
(b) Connect air hose (6) to globe valve adapter (5).
4-3